No Javascript Found

6. Patriarchate of Jerusalem 6.2 Holy Church of Resurrection StudiesStudies | Designs | Photos | Publications | Memorandum



Speakage: Riva Lava :: Sound engineer: Nikos Myrtou

6.2 Holy Church of Resurrection [Studies]
S/N WORK YEAR
1. Documentation of the Golgotha 1986
2. Documentation of the Holy Church of the Deposition from the Cross 1986
3. Αrchitectural Study of the floor of Golgotha 1986
4. Construction of a model of Golgotha 1986-87
5. Documentation of  the Holy Church of Resurrection 1986-87
6. Study for the consolidation and restoration of the  Bell Tower, Holy Church of Resurrection  1986
7. Replacement of sumps at  the Holy Church of Resurrection 1986
8. Documentation/sections of  the Holy Church of Resurrection 1987-88
9. Stability Study of the Rock of Calvary in cooperation with the Polytechnic School of the Aristotle University of Thessalonica (Professor P.Panagiotopoulos) 1987
10. Conservation and insulation of Golgothas’ small vault 1987
11. Architectural and static study of the marblesculptural decoration of the Holy Church of the Deposition from the Cross 1987
12. Study and execution the uncovering of the Rock of Calvary. Gentrification of the Holy Shrine   1987
 13. Restoration of Baldwin V Tomb in cooperation with the Patriarchate – Israel Museum, Jerusalem 1988
14. Documentation of Rotunda  – Edicule or Sacred Kouvouklion 1988-89
15. Study and Construction of a wall with marble sculptural decoration, Holy Church of the Deposition from the Cross 1989
16. Construction of a wall with marble sculptural decoration, Holy Church of the Deposition from the Cross    1989-1992
17. Εxecution of coating at  Eptakamaro ( north side of the Holy Church of Resurrection) 1990
18. Study and execution the consolidation of Eptakamaro. Conservation of columns 1990
19. Mosaic decoration at the Holy Church of   the Deposition from the Cross 1990-95
20. Study and Conservation of the “Klapon” Chapel 1991
21. Joint filling for the consolidation of St. Jacobs Church 1991
22. Replacement of the hydraulic system at the Holy Church of Resurrection 1991
23. Reconstruction of the lavatory at the Holy Church of Resurrection 1991
24. Decoration of the Dome of Rotunda 1992-94
25.e Τopographical and architectural documentation of the Holy Sepulchre in cooperation with Professor D. Balodimos 1995-2002
26. Consolidation work at St Jacobs Church 1995-96
27. Mosaic decoration of the dome of Catholicon at the Holy Church of Resurrection 1996-2002
28. Conservation work at Adams Chapel, Holy Church of Resurrection 1997-98
29. Conservation work and Gentrification of the Chapel of the Jail Cell of Christ, Holy Church of Resurrection 1997-98
30.  Mosaic decoration of the South wall of the Catholicon, Holy Church of Resurrection 1999-2000
31. Marbleflooring of the north side of the Holy Shrine of Calvary 2000
32. Archaeological excavation at the west side of Rotunda 1999
33. Electric lighting of the dome of the Catholicon, Holy Shrine of Calvary 2002
34. Lead poisoning of the exterior surface of the dome of the Catholicon, Holy Shrine of Calvary and positioning of a new monumental cross 1997
35. Conservation and new tile flooring at the Holy Yard, Holy Church of Resurrection 1998
36. Reconstruction of the antechamber of the Patriarchate 2002
37. Archaeological excavation and topographical architectural documentation of the Bell Tower and of the surrounding area 1999-2000
38. Conservation and reconstruction study of the missing floors of the Bell Tower 1999
39. Filling the joints for the consolidation of the Bell Tower 2000
40. Archaeological excavation of the site of “Kathisma”. 1999-
2006
41. Conservation of the mosaic floors of “Kathisma”. 2000
42. Study and Construction of a shelter at the Octagonal Church of “Kathisma”. 2000- 2006
43. Various small scale works at the Holy Church of Resurrection
Search georgelavas.ntlab.gr by Google

 
[HOMEPAGE]   [01]   [02]   [03]   [04]   [05]   [06]   [07]   [08]   [09]   [10]   [ΕΛΛΗΝΙΚΑ]     Updated: 02/2008     Top of the Page